How we build

How we build a light steel frame home

From the foundations to the finished home: the main stages of a Pyramid build, with photos from our own sites.

Stage 1

Foundations

Insulated concrete formwork for the strip foundations, then an insulated concrete floor slab.

Stage 2

Light steel frame

Galvanised steel walls and roof trusses, made to measure and bolted together on site.

Stage 3

Roof

Membranes and insulation boards over the steel frame, then the final roof covering, flat or pitched.

Stage 4

External insulation and render

EPS insulation fixed to the outside of the frame, wrapping the whole house, then a decorative render finish.

Stage 5

Windows and doors

Energy-efficient windows and doors fitted into the steel frame.

Stage 6

Insulation and services

Mineral wool between the studs, an insulated ceiling, underfloor heating pipes and the heating manifold.

Stage 7

Finishes

Plasterboard, tiling and the bathroom fitted out.

Stage 8

Finished homes

Homes we have built in Ireland and in France.