How we build a light steel frame home
From the foundations to the finished home: the main stages of a Pyramid build, with photos from our own sites.
Foundations
Insulated concrete formwork for the strip foundations, then an insulated concrete floor slab.
Light steel frame
Galvanised steel walls and roof trusses, made to measure and bolted together on site.
Roof
Membranes and insulation boards over the steel frame, then the final roof covering, flat or pitched.
External insulation and render
EPS insulation fixed to the outside of the frame, wrapping the whole house, then a decorative render finish.
Windows and doors
Energy-efficient windows and doors fitted into the steel frame.
Insulation and services
Mineral wool between the studs, an insulated ceiling, underfloor heating pipes and the heating manifold.
Finishes
Plasterboard, tiling and the bathroom fitted out.
Finished homes
Homes we have built in Ireland and in France.
Would you like to see it for real?
You can visit a finished home and a home under construction at the steel-frame stage. Contact us and we will arrange it.